Sample Project Reports

Sunday, October 17, 2010

sample project reports-Asbestos, Cement, Beverage Industry Projects

Asbestos, Cement,  Beverage Industry Projects

We engaged in providing asbestos, cement and beverage industry projects, which includes abrasive, granite and alcholic beverages & drinks projects.

List of the projects related products:
Bitumin
Cement
Gypsum
Mining
Marble, granite
Refractory products
Coal, chalk and silica etc
Abrasive Cloth
Abrasive & Flint Paper
Abrasive Emery
Asbestos Cement Pressure Pipe & Fitting
Asbestos Pressure Pipes
Asbestos Cement Corrugated Sheet
Abrasive Grinding Wheel
Brick
Bituminious road emulsion
Bonded Abrasive (In form of Block, Wheels and Rolls)
Bricks from Desert Sand
Bricks from Fly Ash
Bricks and Blocks
Buffing & Polishing Compounds Manufacture (Cake Form)
Brick plant (Automatic)
Cement Water Proofing compound
Coal Washing Unit
Cement from Rice Husk
Cement Grinding Unit
Cement Plant
Cement Roofing Tiles
Cement from Rice Husk
Cement Concrete Pipe
Construction Chemicals
Cement from Fly Ash & Lime
Cement Water Proof Compound
Cement Electric Poles
Pre-Stressed Concrete Poles)
Fuel Bricks from Saw Dust
Granite and Marble Polishing stone
Gypsum Plaster Board
Mini Cement Plant (by Rotary Kiln Process)
Mosaic Tiles
Plugging Compound
Pressure Concrete Pipes (Moulding Process)
P.C.C. Electric Poles and Sewerage
Prestressed Railway Concrete Sleepers
R.C.C. Spun Pipe
Salt Glazed Stone Ware Pipes & Fittings
Silica Sand
Semi Automatic Brick
Silica Ramming Mass (Acidic Ramming Mass)
Silicon Spray
White Cement
Bricks from Fly Ash
Prestressed Concrete Sleepers
Iron Ore Mining
Fuel Briquettes from Agro Waste
infotech, hospitality, hospital, college, school, medical, entertainment, club, ware housing & real estate projects:
Glass bottle from scrap
R.C.C. Bricks (used in petrol pump flooring)
Grinding media balls and m.s/s.s ingots
Mineral wool
Micronized powder of calcite
Concentrated manganese ore production
Granite tiles cutting & polishing
Fire clay bricks
P.P. woven bags for cement
PVC solvent cement
Portland cement plant
Gypsum plaster boards
Gypsum plaster products
Oxygen Lancing Pipes (gas lancing pipes, tube)
Bitumen Emulsion
Interlocking Cement Blocks
Interlocking Paver Blocks
Bricks from Fly Ash (Triolectric Beneficiation Process)
Calcium carbonate from limestone (precipitated and activated)
RCC(Reinforment Concrete Cement)
Polesbricks from fume dust (used in construction)
Gypsum based products (gypsum powder, gypsum board & pvc laminted gypsum ceiling tiles (integrated production unit, ready mix concrete and many more
Alcoholic and Non Alcoholic Beverages
Drinks (soft & hard) Aerated Water
Alcoholic beverages and vinegar
Alcohol from potatoes
Alcohol drinks from ethyl
Alcohol from Rice Straw
Absolute Alcohol from Molasses
Alcohol from Rice Straw
Apple Fruit Juices with Canning & Bottling
Absolute Alcohol (Ethanol)
Alcohol from Tapioca Starch
Amyl Alcohol
Beer industry and alcoholic beverages
Bottling Plant (Alcoholic & Non Alcoholic)
Brandy, Cold Drinks (Soft Drinks)
Mineral Water






Each Detailed Project Report Contains-

INTRODUCTION : Project Mix,Uses & Applications, Quality Control Measure & Their Introduction for Attaining Required Properties Economy & Productivity Competence.

MARKET SURVEY : Market Position, Installed Capacity Production, Anticipated Demand, Present Manufacturing the Product,Imports & Exports,Estimated Demand,Demand & Supply Gap(If available),LI/IL Issued Recently.

RAW MATERIALS : Raw Material Specifications,Market Codes & Raw Material Prices, Sources Of Procurement Of Raw Materials[ Imported /Indigenous]

PROCESS OF MANUFACTURE : Manufacturing Process, Formulations, Process Flow Sheet Diagram

PLANT & MACHINERY : Range Of Machineries Required, Detailed Specifications of Machines & Equipments,Prices Of Machineries, Suppliers of Plant & Machineries

LAND & BUILDING : Total Land Area Requirement With Rates,Covered Area Break-Up With Estimated Costs Of Construction

PROJECT ECONOMICS : Land & Buildings, Plant,Machinery & Other Fixed Assets,Total Capital Investment, Working Capital Assessment, Raw Material & Consumable Stores, Staff Salaries & Wages, Utilities & Over heads,Total Cost Of Project,Sources Of Finance/Refinance,Break Even Point Determination.

ANNEXURES OF CHARTS/FINANCIAL ASPECTS : Repayment Schedule For 5 Yrs., Result Of Performance,Depreciation Chart For 5 Years, Cash Flow Statement For 5 yrs., Projected Balance Sheet, Land Man Ratio etc.


Cost Of  The Each Sample Project By courier 1,050/INR
Cost Of  The Each Sample Project By Mail Soft Copy 1,000/INR


Send Business Enquiry -

projectreports.net@gmail.com

No comments:

Post a Comment